planAn elevated road on the outer ring, Don Kaew to Mueang Kaew

ทางยกระดับบนทางหลวง 121 ดอนแก้ว–เมืองแก้ว

20.9 km on stilts along the canal road, about 2,000 million baht, and it might block the mountain.

studystatus
2,000million baht
20.857km
2025as of

agency Department of Highways

What it is

The highway department, not the expressway authority, studied six models from March 2025 for an elevated road on the west side of Route 121, 20.857 km. Model five was preferred at about 2,000 million baht, 1,000 to build, 500 for land and 500 to operate, about two and a half years, with congestion cut by more than half; the objection recorded is that it may block the view of Doi Suthep. An initial and then a full environmental assessment are required. Separately the department held a hearing on redesigning the canal road for congestion.

Connected to

Named here by

Where each claim comes from
FieldTierSourceNote
defaultcitedBig development project heading our way — elevated road on Route 121 — Chiang Mai Citylife
text_thinferencewritten in Thai by this project, in the northern register where it fits; not machine-translated

Sources

cited Cited — a named source, linked · harvested Harvested — fetched from an open dataset, with its licence · tradition Tradition — general knowledge of the tradition, hedged · inference Inference — this project's own reasoning from the above · field Field — someone stood there

This record as JSON